Since 1977, NIKE Energy has continuously expanded its engineering and manufacturing capabilities through product development, new technologies and participation in demanding infrastructure applications. The milestones below trace this journey from the company's early mechanical engineering work to its present capabilities across power, railway, aerospace and industrial engineering.

1977
Four-Sheave Pulley Wheel Manufacturing

Began manufacturing wheels for four-sheave pulleys, marking an early step in NIKE's engineering manufacturing journey.

1978
Sagging Winch Machine Repair & Overhaul

Developed capability for repairing and overhauling sagging winch machines.

1982
Drum Lifting Jack Repair

Expanded engineering capabilities into the repair of drum lifting jacks.

1983
Drum Lifting Jack Manufacturing

Progressed from repair work to manufacturing drum lifting jacks.

1985
Trolley Wheel Manufacturing

Developed manufacturing capability for wheels used in trolleys.

1987
Erection & Stringing Pulley Development

Developed erection and stringing single-sheave pulleys for four-sheave pulley applications.

1990
Single, Three & Five-Sheave Rollers

Started manufacturing single, three and five-sheave rollers.

1991
International Exports

Started exporting products to international markets, beginning NIKE's global business journey.

1995
Diesel Locomotive Braking System

Developed a braking system for diesel locomotives, expanding into railway engineering applications.

2000
Diesel Locomotive Cattle Guards

Developed cattle guards for diesel locomotives.

2002
BHEL Turbine Spares

Started working with BHEL for various turbine spares.

2005
Rail & Rope Tools and Ladders

Developed manufacturing capabilities for rail and rope tools and ladders.

2006
Power Transmission Hardware

Began production of hardware fittings for power transmission lines.

2008
Specialized Tools for CPRI

Designed and developed special tools for CPRI.

2012
EHTS Conductor Stringing Equipment

Developed stringing equipment for EHTS conductor applications.

2014
Major River Crossing Project

Designed specialized tools for India's longest river crossing project in West Bengal.

2017
High-Precision CMM System

Installed a high-precision Coordinate Measuring Machine (CMM) system to strengthen precision inspection capabilities.

2018
Quick Release Couplings

Developed quick release couplings for industrial and engineering applications.

2019
91 Railway Electrification Fittings

Developed 91 railway electrification fittings for OHE and TSS applications.

2020
Locomotive & Fastener Development

Developed locomotive pantographs and motor suspension units and launched the Cierre-A brand for stainless steel and HDG fasteners.

2021
HAL Kanpur Workshop

Operated a workshop at Hindustan Aeronautics Limited (HAL), Kanpur – Transport Aircraft Division for precision machining and injection moulding through the technical team.

2022
Critical Locomotive Components

Became an approved source for electrical and diesel locomotive critical components and began manufacturing a 1.6T hand-operated pulling and lifting machine.

2023
15,000+ Railway Wheels Machined

Machined more than 15,000 railway wheels, while also developing Perrot coupling and HDPE socket products and upgrading traction regulating equipment.

2024
High-Reach Pantograph & 765 kV Hardware

Developed a high-reach pantograph prototype and expanded specialized hose coupling capabilities. The company was also approved for 765 kV transmission hardware.

2025
Critical Diesel-Engine Components

Continued engineering development through the manufacturing of critical components for power assemblies in diesel engines.

NIKE Energy engineering and manufacturing milestones from 1977 to 2025